W
I think you need to upgrade the whole CU area.. its time for whoever owns the mess to pay up..Should I upgrade 6mm E.
Thanks for your replies.

Once I found the problem I fitted 63a RCD as isolator in main DB with Henley Block.
Problem now is that 6mm E.