Most 4 pole equipment such as MCB's, RCD's, and Switches will incorporate the early make, late break on the neutral pole which is always clearly identified, so as not to confuse with phase poles.
 
Because £££££££££££££

Boydy
Thats my point really...has anyone asked the question re cost 3 separate supplies? If all meters in central position, possibly 1 x larger supply cable reqd. If Ryfield box reqd, then more than likely 95mm CNE cable reqd plus cost of all switch gear sub mains.
Plus legal issues at a later date if 1 or more of the dwellings sold off. Cable / meters on 3rd party land.
Always best to consider all options, implications etc.
 