N
NoSparks
Please think about question 1 in your mind before reading question 2.
Question 1.
If an annex to a building contains a gas meter and CU (fed via a sub main from the main building) then is the bonding required to go back the the earthiing terminal at the local CU or the earthing terminal in the main building?
Question 2.
If the gas meter in the annex feeds the main building as well as the annex then. Same question ( is the bonding required to go back the the earthiing terminal at the local CU or the earthing terminal in the main building?)
Question 1.
If an annex to a building contains a gas meter and CU (fed via a sub main from the main building) then is the bonding required to go back the the earthiing terminal at the local CU or the earthing terminal in the main building?
Question 2.
If the gas meter in the annex feeds the main building as well as the annex then. Same question ( is the bonding required to go back the the earthiing terminal at the local CU or the earthing terminal in the main building?)