L Lucien Nunes Aug 20, 2019 #32 But if there are hidden loads on an existing circuit being tested for an EICR, not joining L & N together could inadvertently apply 500V across the load and cause damage. Best to test both to earth at once if unsure.
But if there are hidden loads on an existing circuit being tested for an EICR, not joining L & N together could inadvertently apply 500V across the load and cause damage. Best to test both to earth at once if unsure.