O

Ohmagain

20130927_111900.jpg
Just uncovered the treasure trove of problems, any recommendations.
These are active heating and hot water piping, they are sitting on a solid concrete beam which must have took the installer hours to cut out, was thinking of lagging the pipes and trunking the cables but there is minimal space, is this my only option.
one idiot has also put a cable trough a metal pipe which heats up stupid amounts so will move that of course.

This is the worst of two of these :(
 
A few clips on the larger bunch if you've got space just to keep them away if you can, but tbh I've seen much much worse than that!

Assume the single cable can't pull under / over the other pipes? Although...it's probably like that for several other joists as well.

Tell customer, put board back, get paid, drink beer.
 
Have to agree, not much you can do other than noting it on the cert (assuming you are doing an EICR?). Unless of course the customer wants to pay for rectification work to correct it all :-)
 
thats a job for power tools if ever i saw it !! lol.
be a man and angle grind the channel another 50mm wider to give the wiring some proper room.
:-)
 
How did you discover this, was you doing an EICR or remedial work ,if its a EICR just note it as a deviation on the report.
Are the cables RCD protected ? does not look there 50 mm below the finished floor level. :)
 
How did you discover this, was you doing an EICR or remedial work ,if its a EICR just note it as a deviation on the report.
Are the cables RCD protected ? does not look there 50 mm below the finished floor level. :)

you're unlikely to lift the floor boards for an EICR.
and whats that bit about cables need to be more than 50mm below floor ?
 
I'd just put the floorboards back and say no more.
The expression 'Opening a can of worms' springs to mind. :-)





















Disclaimer: assuming there wasn't any visible heat damage to them cables.
 
Unless the job was to actually sort that lot out, I'd just shift the cables as best I could and tie them back. Better than nothing. Then again, you're not gonna make much impact from one lifted board! Mention it to the customer and see if they'll pay for you to sort it properly!
 
That reply makes me very happy, thank you :)
rule 1 on condition reporting or anything found whilst carrying out other works:

leave well alone until the client asks you to sort it...

this way you cant be accused of anything like:
`well it worked before you came`...
or:
`my hubby did that and he were rite proud`...

plus dont forget that any extra work is on top...
 