W
wiganspark
Morning all
Ive been asked to carry out some repairs on a commercial office block which had a test carried out in march last year, the contractor completed a periodic and not an eicr, one of the items picked up was a 4mm 4 core swa carrying 2 circuits(2x16a),2 lives and 2 neutrals and the steel acting as the c.p.c for both circuits, these are on different phases,the contractor has coded this as a 1 but what would it be on eicr ?
thanks
Ive been asked to carry out some repairs on a commercial office block which had a test carried out in march last year, the contractor completed a periodic and not an eicr, one of the items picked up was a 4mm 4 core swa carrying 2 circuits(2x16a),2 lives and 2 neutrals and the steel acting as the c.p.c for both circuits, these are on different phases,the contractor has coded this as a 1 but what would it be on eicr ?
thanks