Thought it might be interesting to see some of the things you guys work on. I had a fairly easy day today, I replaced a borehole pump motor and then removed a water pump that has a leak for repairs in our workshop.

The borehole pump was 80 meters down so we had to pull it out first by hand. Removing the motor is a piece of cake, literally 4x 8mm nuts. New motor on then a resin joint on the supply cable. An hour later after the joint is cured, reconnect pipe, truss everything up like a Christmas turkey with cable straps then back down the hole it goes.


Removing the pump.



Resin joint.


This is the dam that the borehole fills, it's half way up a mountain in the middle of nowhere so couldn't resist a quick skinny dip at lunch time to cool off whilst the joint was curing.


Disconnecting and removing the Grundfos pump (on the left of the photo) was all I did this afternoon.

That was it, home by 4pm.

I1.jpg


I2.jpg


i3.jpg


I4.jpg
 
Wow that is some place to work, me been on paperwork all week writing up an 800 circuit EICR. God damn ECA/ELESCA yearly assessment tomorrow.
 
Wow that is some place to work, me been on paperwork all week writing up an 800 circuit EICR. God damn ECA/ELESCA yearly assessment tomorrow.
Good luck for tomorrow ...
Do you know the guy - or just a random person who will ask if you know Ohms Law?
 
Must've been pump day today, I did one too. Not so nice as Marvo, just a pool refurb. At least it was outside :)
 
Must've been pump day today, I did one too. Not so nice as Marvo, just a pool refurb. At least it was outside :)
Cheers Wilko, the Elesca bit is a joke we keep it because some rare jobs need Part P notification, how many this year, two but hey ho life is what you make it.
 
Paaahhh that's nothing. I spent a several hours, in an extremely warm environment, and also very dry..........someone's itchy loft space.

Spent half an hour trying to drill a core hole with an SDS drill. Then to cap it all, lady of the house said can you fit me new Marks & Sparks light. Took down the old fitting and found this garbage.

Light.jpg

Still could be worse, could of been up some dusty mountain, being stalked by wild animals :)
 
am I the only one here on easy Street?
all I was doing was 2nd fixing a flat. The only drama I had was fishing light cables out the ceiling :eek:
 
Lol, no wild animals today just a couple of tortoises I relocated off the road. We work on a lot of remote bore holes and water pumps, it's work I enjoy doing and something of a niche market we kinda got well known for over the years. It started when I used to work on mining pumps which was an area that was swamped by big national and international players and we ended up doing more and more boreholes which was actually far more profitable for us and much preferable working environment but nobody else seemed particularly interested in at the time.
 
I worked in a multi million pound injection molding company adding a flood light under the sign, a fire alarm bell for a door bell (in the factory side for deliveries) did install a klaxon as the spec was and i quote "something loud"... way over kill as well as adding two sockets and a work light to five portable benches.
Last time we were there before we installed a car charging point.
Really enjoyed this job. Nice people working there and a nice end result.
 