S
only recently qulifide and came across this then pricing a job looks to me like a TN-C-S with the earths coming from cut out but was unsure due to 2 cables going in at the bottom.
only recently qulifide and came across this then pricing a job looks to me like a TN-C-S with the earths coming from cut out but was unsure due to 2 cables going in at the bottom.
Its a TN-C-S (PME) System. the cutout have been changed to suit. It does state on your photo that its a PME but if you want to double check contact the supplier.
Depending on your planned work (i.e. if your thinking of a rewire) you may need to contact the supplier anyway to uprate the fuse?
TN-C-S Drawing Attached.
PS: Interesting to see the difference in the colour of the L & N meter tails!

bl@@dy hell, Nothing wrong with your eye sight![]()

Ta very muchonly recently qulifide and came across this then pricing a job looks to me like a TN-C-S with the earths coming from cut out but was unsure due to 2 cables going in at the bottom.