yep jay....thats what i was looking for mate...
someone who thinks about it....
doesn`t just install rings `caus thats how it is`.....
or any other thoughtless crap like that...
 
you use whats appropriate to the job....
this is why i cant stand that radials V rings thread stupidity whenever it crops up....
 
you use whats appropriate to the job....
this is why i cant stand that radials V rings thread stupidity whenever it crops up....



I installs what ever is easiest, cheapest and does the job I designed it too. You will always get people installing rings no matter what but that's how they've always don't it.....each install is different and deserves to be tret as such. As I said, there are not a lot of power points (custmoers request), so it doesn't warrent rings. Less time, less cable....every ones a winner!!!
 
I installs what ever is easiest, cheapest and does the job I designed it too. You will always get people installing rings no matter what but that's how they've always don't it.....each install is different and deserves to be tret as such. As I said, there are not a lot of power points (custmoers request), so it doesn't warrent rings. Less time, less cable....every ones a winner!!!
indeed not Jay...indeed not..listen,
i worked for this guy once....
now, he was allrite was leigh...in his own way....but the amount of times we would rewire one of those back to backs up harehills....you know the ones with 2 beds on 3 floors...it was usually a case of a kitchenette at one side of the downstairs room....so you were talking about 4-5 points served for the room....and maybe 4 points for the kitchinette....he would install a ring for each!!....
total madness....and a clear lack of any understanding of what was appropriate to the job in hand/demand...
he would give em 32A for each...the bullit was usually 60A for christs sake....it always said 100A on the carrier but most of em round there are shared supplies anyway so you would think that common sense would prevail wouldn`t you....its just a case of looking at it...
interlect had few opportunities there...
 
I'd forgotten about starting this so I'll update.
I walked past the place today and there was a guy putting socket faces on, when I came out of the paper shop he was outside having a smoke so I went to talk to him and asked if he was a spark. He played the "no speaky English" card but when pressed he spoke clearly and told me that he had no electrical training at all but was working from circuit diagrams the owner of the property had printed from google. He then went on to add that he had no idea whether what he was doing was right, he also didn't know whether or not someone would be coming to test his "work"
He then told me that the property owner had instructed him to install a cooker circuit in the flat above.
I bit my lip and walked away. I have however sang like a bird to environmental health, the HSE and building control. Not that I expect anything to be done of course.
 
I'd forgotten about starting this so I'll update.
I walked past the place today and there was a guy putting socket faces on, when I came out of the paper shop he was outside having a smoke so I went to talk to him and asked if he was a spark. He played the "no speaky English" card but when pressed he spoke clearly and told me that he had no electrical training at all but was working from circuit diagrams the owner of the property had printed from google. He then went on to add that he had no idea whether what he was doing was right, he also didn't know whether or not someone would be coming to test his "work"
He then told me that the property owner had instructed him to install a cooker circuit in the flat above.
I bit my lip and walked away. I have however sang like a bird to environmental health, the HSE and building control. Not that I expect anything to be done of course.

Good for you trev. I bet the owner has property abroad and a flashy car too.
 
A bloody big black Mercedes mate. I'd love to really pee on his fireworks because he doesn't give a damn.

Even if he got hauled over the coals, I bet he wouldn't give a damn, or change his ways...
People like him make me sick.
 
that's not always a good thing....just ask my wife.lol.




As I said, it is very basic. There's only 8 circuits. Easy access throughout. 2 days for 1st then 2 days for 2nd plus testing. I dont have breaks as such, I just grab a bite wen I can. Time is money..lol


In at 5am, run, drop into the pit at 10:30?
 
indeed not Jay...indeed not..listen,
i worked for this guy once....
now, he was allrite was leigh...in his own way....but the amount of times we would rewire one of those back to backs up harehills....you know the ones with 2 beds on 3 floors...it was usually a case of a kitchenette at one side of the downstairs room....so you were talking about 4-5 points served for the room....and maybe 4 points for the kitchinette....he would install a ring for each!!....
total madness....and a clear lack of any understanding of what was appropriate to the job in hand/demand...
he would give em 32A for each...the bullit was usually 60A for christs sake....it always said 100A on the carrier but most of em round there are shared supplies anyway so you would think that common sense would prevail wouldn`t you....its just a case of looking at it...
interlect had few opportunities there...
:15:..............................
 

OFFICIAL SPONSORS

Back
Top