M
mogga
If it says 60 on the outside then it will only take 60 MAX DNO will need to upgrade cutout as cutout is rated at 60a the fuse might only be a 40 CALL THE DNO this job cant be done by a spark never mind a 6 week plumber as for your changing the C.U I trust your client will be having the cert delivered by post filled in by joebloggs?
