J

joehat

I've always assumed this rule was the same under slabs or concrete, not just under soil Ect.
Am I correct as the regulation doesn't state so that's why I assumed it.

The reason being, I've just gone and quoted a job and another (electrician!!) quoted a lot less, I asked how much Ect and how he was doing it and he said he would cut a cap below the slabs and run swa to the shed. ??
 
below slabs, it's unlikely to get a spade spiked into it, so you can reduce the depth. still got to install safely and sensibly, though.
 
The requirement is to ensure that the cable will be undisturbed by any normal activity.
450mm is a generally recommended minimum and 600mm if the ground is likely to be disturbed.
However if the cable were to be laid under a fixed surface then it is protected and so long as someone can identify the warning tape before the cable if any work is done then you should be OK.
If it were under slabs then I would put a strong barrier, concrete of thick plastic capping (which would also cost a lot) in order to prevent damage on removing replacing slabs.
 
not if it complied to BS7671.
 
Would this be put down under a diversion from bs7671 on the cert form then I guess?

How about not guessing and looking up the regulation ? If you are unclear on this then its best to educate yourself so you know for next time.
 
and a diversion is a detour around a flood/road works/fallen tree/road runners etc. the term you want is departure.
 
I always try to aim for a minimum of 450mm when doing runs in gardens etc, but when its under a path... 300mm
 
I've always assumed this rule was the same under slabs or concrete, not just under soil Ect.
Am I correct as the regulation doesn't state so that's why I assumed it.

The reason being, I've just gone and quoted a job and another (electrician!!) quoted a lot less, I asked how much Ect and how he was doing it and he said he would cut a cap below the slabs and run swa to the shed. ??
can you expand on your logical thinking here ?
 
can you expand on your logical thinking here ?
I think he means that if its under someone's rose-bed then it needs to be deep enough not to be disturbed when they dig the muck in, but if its under paving slabs then its not likely to be disturbed and if it is then it will be obvious that it is there. That's what BS7671 say's isnt it?
 
Bit of a sticky one this, dont think ive ever seen or heard of any spark actually digging a 600mm trench then back filling with sand etc as per regs down the length of someones garden with a 2.5 swa to supply a garden shed, in the real world this doesnt really happen

the amount of armoured cable ive pulled out of the ground has barely been covered with top soil
 
As far as I can remember there is no actual stated depths for SWA in the BYB.

Please correct me with the reg number if this is incorrect!
 
As far as I can remember there is no actual stated depths for SWA in the BYB.

Please correct me with the reg number if this is incorrect!

Only in special locations, depths and heights are specified for buried and overhead cables. I think the cue for general buried installation where the cable is likely to be disturbed is based on this info.

I also remember seeing some industry best practice guidance once too.
 