Octopus
I wouldn't do ANYTHING until you have conducted both a Ze and Zl tests.....
If I were you I wouldn't go near the clamp, either leave it alone or get the DNO to sort it. WPD are normally very good over this sort of thing I can't understand why you say the were not interested.I am a trainee but I'm capable of doing a Ze. I'll do it this week and see what it says.
Tbh if it's an acceptable reading I'll leave it because although it looks simple to get rid of that terminal block and then terminate the existing cable to the existing clamp it's clear it's not that simple with many factors
Your winding him up Richard are you not???The clamp looks as if the screw for tightening is the same as the screw for retaining the cable in place.
Admittedly the clamp looks very loose and appears to be held off from the cable sheath by something, however if you were to firmly affix a cable lug (the cable in the picture looks to be larger than the 6mm² you are referencing in the link to the lug you gave) to the clamp then the force applied to clamp the lug will also be applied to tightening the clamp, if the clamp can tighten enough to compress the cores and damage them then they could short to the lead sheath or each other.
That said it does not appear from the picture as if that clamp can tighten beyond a certain point which looks as if it would still be a loose fit on the cable sheath.
A hepworth clamp needs a special tool to close it and uses an earth braid for connection so is not ideal in this case, a constant force spring would be OK but they seem to be hard to obtain easily at a reasonable price.
Since you have had verbal authorisation from the DNO to change the cable it would be worth looking at the job in detail to see what it entails and only proceed once you are sure it is safe and your resulting solution will be secure and effective.
Just pointing out the less likely problems, in practice I would not think all that much, except about altering the DNO's connections.Your winding him up Richard are you not???
You might find out if you mess around with that cable, that's been sat there since before the War, annoying no one. I expect that's why the DNO electrician said to crack on, save him a new pair of safety glasses. :wings:How could it go bang?
Apologies gazdkw82 for my rather jocular reply. Paper insulated lead sheathed cables (I think that is what you have) have been used by utility companies for quite some years, the 1920's and possibly before, for electrical power distribution. There is no way you could tell the installation date of your installation, but it could be as old as your house. Whilst these cables can withstand the passages of time, and allegedly have very good reliability, your cable has not been moved for some time, and a bit like me, has become set in its ways. Therefore there is not certainty of the state of the internal insulation coverings. Hence in short, if your were to attach a clamp, and tighten said clamp too much, it 'could' cause the internal conductors to short. I'm sure you will understand the consequences of that. Therefore IMHO, I would not alter the earthing clamp on the service cable, leave that for your DNO.I don't understand how it could go bang by sorting the cable? keep in mind im a trainee, can you explain more??
do you mean it could go bag if there is a fault current? or do you mean if the clamp touches the wrong part of the rod whilst moving?
I don't understand how it could go bang by sorting the cable? keep in mind im a trainee, can you explain more??
do you mean it could go bag if there is a fault current? or do you mean if the clamp touches the wrong part of the rod whilst moving?
And quite frankly, the cupboard could do with a bit of a hoover.![]()
In the latest edition of Connections (NIC/Elecsa publication), there was a piece on ‘Who is responsible for equipment upstream of a consumers switchgear’. They refer to a document, ‘Meter Operation Code of Practise’ (MOCOPA) issued 1[SUP]st[/SUP] July 2013.That's makes complete sense Midwest! Thankyou!