So the fault is on the first leg.?2 radials = ALL the sockets except 1 and a radial of 1 socket - hardly a sensible split!
So the fault is on the first leg.?2 radials = ALL the sockets except 1 and a radial of 1 socket - hardly a sensible split!
So the fault is on the first leg.?
Oh yeah my bad Clive.As described in the OP!
Why?, I understand if the client is a regular and all that , but even so I think the OP has done more than his fair share, to spend time locating the fault.Not part of the report IMO, you will all be working for nothing.?If there is enough of a profit margin in the EICR and easy to replace the cable I would just do it.
Was not thinking of a stupid split was thinking upstairs and downstairs being the two radials. What was you thinking...sighhardly a sensible split!
But probably more trouble than replacing defective cable, so back to the drawing board