Maintenace and installation work are two different things altogether. All installation work requires bonding in place maintenance doesn't.

Please tell me you have a copy of the BGB

How does a RCD stop a extraneous conductive part coming live?

bgb ? ...
 
This is now ridiculous, what has happened to our trade, what is happening here???????????????????????????
 
It is supplied via a plastic pipe. Does this mean bonding is or isn't required?
IR Test between that copper that you said was there and the met and if its more than 22 kohms don't bond it and if its less it needs bonding
 
I will quite happily feed the trolls today as I am stuck in a hotel room in Manchester bored out my mind.

- - - Updated - - -

like fishing in the rain :D

part p non applicable in scotland

Since when was part P the same as the regs?

you really must try harder.
 
Can someone post something interesting please :28:

ImageUploadedByTapatalk1359825557.721609.jpg.
 
I will quite happily feed the trolls today as I am stuck in a hotel room in Manchester bored out my mind.

- - - Updated - - -



Since when was part P the same as the regs?

you really must try harder.


do some research guy with weird hat
 
Research on what? We are discussing bonding not Part P, you were the first to mention Part P maybe you could explain you reason why.

i dont actually care

just my personal opinion on the situation

THATS ALL
 