As TaffyDuck has already said fault could be anywhere between mains intake position and sub station. Fault could easily rise way above existing 1.7 ohms. Get DNO out to it. Generally find they respond very quickly to earthing faults on distribution system. Generally couple of hours max.
 
As TaffyDuck has already said fault could be anywhere between mains intake position and sub station. Fault could easily rise way above existing 1.7 ohms. Get DNO out to it. Generally find they respond very quickly to earthing faults on distribution system. Generally couple of hours max.
but he needs to get put straight through to the duty engineer....
not some dopy, obnoxious bint on the end of the phone....
 
Bang an RCD in and you will be fine, in the mean time you could contact the DNO and ask them to improve the reading, 1.7 ohms isn't the end of the world and far better than a pin in the ground giving a 30 ohm reading lol.

So if you were to put RCDs in to meet disconnection times on a TN system that doesn't meet maximum Zs, what I wonder is the position then with certificating the work, particularly in terms of the should-virtually-always-say-None "Deviations from BS7671" box? I know it'd be kosher on a TT system as you have little choice, but on a TN system where Zs is above max...
 
I have had this situation before and the DNO asks do you have RCD protection if yes manyana manyana if not we will be in tomorrow
 
you don't rely on RCDs for disconnection times if at all possible. it's a poor DNO earth. let them sort it, then you can get your testing done.
 
more likely the dozy bint will give you an alternative number that is programmed to play incessant frank sinatra garbage till you get fed up of holding.
 
more likely the dozy bint will give you an alternative number that is programmed to play incessant frank sinatra garbage till you get fed up of holding.
look, they have a duty to the phone company see...
in future you may be given options to press...
choose from:
.8
.35
21
 
look, they have a duty to the phone company see...
in future you may be given options to press...
choose from:
.8
.35
21

Then it'll ask you to enter lots of details in order to get you through security checks, ready to be put through to a human being who will then go through all of them again. No, my postcode hasn't changed in the last two minutes, dear.
 
Forget duty engineer IO called Transco for a gas leak and the guy in the call centre could barely talk English not happy with this I called them to say how on earth can anybody report a leak and then said O by the way I had to pay for the call as my mobile provider would not allow a free call and it would also be nice to be thanked a bit like this forum actually
 
that's half the problem with everything today. you sign up for something with a british company, everything is OK and then you get a problem. so you phone the 24 hour help line and get talking to someone who sounds like the punka wallah. can't understand a word.
 
that's half the problem with everything today. you sign up for something with a british company, everything is OK and then you get a problem. so you phone the 24 hour help line and get talking to someone who sounds like the punka wallah. can't understand a word.
Whey thas them caal senta thingys intha toon ye knaa, wu aal talk propa hea an ye cin unastend wu perfect.
 
Last edited by a moderator:
you don't rely on RCDs for disconnection times if at all possible. it's a poor DNO earth. let them sort it, then you can get your testing done.
agreed...its cheap n slovenly..
theres no reason why a well designed system with a stable, reliable means of earthing cannot meet disconnection times without the magic `RCDs`...it bloody well should be doing anyway...
 

OFFICIAL SPONSORS

Back
Top