S
Stroppy
Sort of. Thanks for coming and correcting and tidying my install for me to take this photo. 


No sweat mate how can perfection be improved:yes: I tend to get by on my natural good looks and sophistication. i did that install on a friday afternoon after 3hrs in the pub (not bad eh) I managed to get down 6 pints of fosters and 3 scotch an cokes and i was still able to put in cu and drive home. Amazing Stuff , i can sense the admiration from you even now:yes:Sort of. Thanks for coming and correcting and tidying my install for me to take this photo.![]()
I'll add some pictures of a Job just being completed. The pictures are my snagging pictures so that I have a visual record of the snags etc and ensure the work is completed as per the program before my final report.
View attachment 18721View attachment 18722View attachment 18723View attachment 18724View attachment 18725View attachment 18726View attachment 18727View attachment 18728View attachment 18729View attachment 18730View attachment 18731View attachment 18732View attachment 18733View attachment 18734View attachment 18735View attachment 18736View attachment 18737View attachment 18738View attachment 18739View attachment 18740View attachment 18741View attachment 18742View attachment 18743View attachment 18744
At last, a proper trefoil cable run! And a descent sized job to boot, what’s the MVA rating of the installation?
Picture 9, is that a dual bus-bar sytem?
















)
The A1 ring final circuit should have 2.5mm cable with a 32amperes BS60898 type B circuit braker, and it can potentially cover 100m^2 of space.



and thank you!Couple of observations;
- The layout of the conduit should have been considered so that they did not need to cross
- Conductor length needs attention, if you look at one of the browns in the spur you can see where it has been rubbed when the faceplate screwed back.
I appreciate a lot comes with experience, but it's things like the scuffed cable that can cause you problems both in college and the real world, I would be none to impressed when testing a new install to find that.
From what I remember, they must cross as part of the assessment, and a large portion of the marks are dependent on your ability to set the conduit neatly