Basically got a 2 way con unit in a block of 4 flats, 1 x 6a mcb feeding lighting via timeclock,28w 2d fittings,wired in pyro and 1 x 16 mcb feeding a sw fused spur for the door entry system, new door entry was fitted last month and everytime the clock fires the lights up or knocks them off the...