T

thekingiam

been working on some comunal flats above a take away other electrician has walked off site.
the owner wanted to rent one of them out today so asked me to turn on main cut out fuse at meter he told me it had been powered up before and know problems, stupidly i did! checked flat and cu and still no power. so turned off at meter and explained i need to test.
5 mins later the boss was in takeaway and says half the lights in shop had just gone out, checked at distribution board in take away with voltage tester and no voltage from one of the 3 phases to the neutral bar.
so guess i have blown one of the three phase main cut out fuses and need to ring supplier to replace.
will they charge for this?
 
The idea is to call as a sparky for the takeaway and say your missing a phase from their meter.... disconnect and isolate all flats related wiring, say you found a fault in the takeaway and have cleared it but it seems to have taken their fuse out.... if this dont work then yes you could get charged (region dependent) and lesson learnt ...never energise another sparkies work especially one thats fallen out with the landlord :dead: ..

PS only joking about the above of course i wouldn't condone lying to the DNO ....
 
i don't need to act dumb i am lol

The fact your in this predicemant does say alot lol.... you'd always test your own work before energising so why on earth did you not test someone elses ...assuming its the cause of the missing phase........... as i said before its a lesson learned and something you wont do again :iamwithstupid:
(No offense meant just taking advantage of your balls up for my amusement ;) )
 
yeah i know i shouldn't of energised but the owner has been trying to rush my work i am only wirring halway lights.
computers attached to circuit in take away flourescent lighting etc so don't want to do insulation resistance test.
 
You get alot of pushy clients that try and rush jobs buddy - they tend to think everything electrical is simple and takes 5minutes for some reason.

It was my floor in the early days, being too nice and not standing your ground. Need to toughen up abit with the clients in future thekingiam :) The job will take aslong as YOU think it needs to take, not anyone else.

Like the others have said, lesson learnt :) We all make little boo-boos from time to time, you're definitley not alone buddy :)
 
Old fuses can just fail on their own. Just do some dead tests before the dno arrive or disconnect the flat in question and do a EICR.
 
looking at cu in flat electrician has not run a seperate supply to it he has taken supplies to each circuit from cu next to it avoiding mcbs.
i can probably use other cu main supply for this flat, but running a new main supply is going to be difficult as flooring has been put down and plastered.
what's the best way of suplying both cu from one incommer, henley block at cu 's then split
then upgrade incoming switch fuse?
 
You get alot of pushy clients that try and rush jobs buddy - they tend to think everything electrical is simple and takes 5minutes for some reason.

It was my floor (flaw) in the early days, being too nice and not standing your ground. Need to toughen up abit (a bit) with the clients in future thekingiam :) The job will take aslong (as long) as YOU think it needs to take, not anyone else.

Like the others have said, lesson learnt :) We all make little boo-boos from time to time, you're definitley not alone buddy :)

:24: bad donkey
 
Good work Tele, nice to see the Sheriff is out doing the rounds when the deputy is busy making coffee and punching himself in the face... (i actually just split my own lip and made a tooth bleed after carrying a box by its nylon strap which just broke resulting in my fist flying toward my face at tremendous speed).

This forum is already suffering from severe troll abuse, let's not catalyse any negatives with poor spelling and punctuation.

:24: This is the Punctuation Pony. If you see this...you're guilty of idiocy.
 

OFFICIAL SPONSORS

Back
Top