Nah....he means 2 twins in, 2 out... one to each light.......as long as it's not the same fitting with 2 sw L's.agree with littlespark. feed to switch, bin the JB. 3 core for 2 x sw/L and 1 x N.
Last edited:
Nah....he means 2 twins in, 2 out... one to each light.......as long as it's not the same fitting with 2 sw L's.agree with littlespark. feed to switch, bin the JB. 3 core for 2 x sw/L and 1 x N.
The only reason I can think of, its a occupied rewire, and the use of jb's will minimise the amount of floor boards being lifted, etc, however those joint boxes would have to assessable.Could someone point out what I'm missing here? This is a rewire and the aim is to bring neutrals to each switch. Is there a reason why this wouldn't be wired as 2 plate, with feed to switch, rather than using junctions?
Is that to assess if they’re accessible?The only reason I can think of, its a occupied rewire, and the use of jb's will minimise the amount of floor boards being lifted, etc, however those joint boxes would have to assessable.
my bad grammar/spelling , yes accessible lolIs that to assess if they’re accessible?