Hi Everyone

Don't often get involved in wiring up central heating! I have been asked to install new Honeywell ST9400c to replace ST7100 on a Y plan (Mid-position valve). The new programmer requires a 5 / 6 core flex.

I can get 5 core every where, but I feel over sleeving the earth is bad practice, so how do you guys get on that are doing it all the time?

Any advice would be much appreciated

Sorry if this is a basic question:dunce2:

T&E
 
7 core and cut some out..................I don't like sleeving the CPC but you can do it if you wish on a flexible cable
 
7 core and cut some out..................I don't like sleeving the CPC but you can do it if you wish on a flexible cable

You can't over sleeve the CPC on any cable, green and yellow can only be used as the earthing conductor.

Sent from my Xperia S using next doors WIFI
 