Agree,thankssee if any two lighting circuits can be put into one breaker. sometimes the lighting circuits are split for convenience e.g upstairs and downstairs and it isn't always unsafe to put them into the same breaker. otherwise just tell him you want to do the job properly and if they arent prepared to pay for it then run away
Yea that’s the best option,will need to switch off & reconnect tails etc.New board next to it fed from the existong would be his cheapest option
You are going to lash a new board off the live side of the existing one??Yea that’s the best option,will need to switch off & reconnect tails etc.
He’s not gonna be happy,work will either be @ night or weekend.
No..connector blocks to supply new DbYou are going to lash a new board off the live side of the existing one??
Agree,hopefully go for the new DbWhen he expresses his disgust with shutting down his site for works perhaps remind him that doing it properly this time round and installing a DB with many spare ways will prevent this problem from happening again in the future.
Edit:
Another option could be to consolidate a few 1P circuits into their own DB fed from the exsisting 3P DB. You could move 4 lighting circuits over to a 1P DB and have enough ways for a 3P MCB and 32A SP MCB to feed the new DB.
Yea,he’s gonna have to go with the flow.If you’re doubling up a couple of lighting circuits here and there, and maybe a single point spur onto a ring.... you’re going to have to reconfigure a lot of other circuits to get 3 together for a 3 phase circuit.
No bodge job, @cliffed Tell him it needs to be done right. Got to keep those phases balanced and all that.