Depends what he`s like. I did this for a guy once, he was an old fashioned carpenter/ joiner. He would phone me up, I`d pop along and check his work periodically.

It took him close on 6 weeks to 1st fix a 4 bedroom house but you could see why.

The work was immaculate. Dead straight channelling, even the cable runs clipped to joists had pencil level lines behind them. It was a masterpeice.

No way would that be commercially viable to do but he was rightly very proud of it and it was a pleasure to second fix.
 
I wouldn't even let him do the chopping out because it won't be to the standard that you want it. You'll have back boxes protruding and not level. Unless they have severe construction experience then fair enough!

Yup, agree 100% but what I did was to pay a visit to see how the back boxes fitted then asked him to do some more chopping!
 
I had this once before mate, was asked to quote fot a rewire bu the guy wanted to run all the cables do all the chasing and for me to do the final connections. He basically wanted me on site to tell him what to do. I declined.

Anyway same guy calls 3 months later and says he needs a DB fitting.. It wasnt too far out the way so i offered to pop along.. waled in the living room and there were wall lights spured from sockets and most of the cable chases were as the crow files...

Instead of 6mm feed for the induction hob he had 2.5mm x 2 feeding the cooker isolator and then to the cooker connection point..

Then the best bit was the 2way lighting. Instead of 3 core he had every switch back to the pendant. So one light 4 swicthed had (6 cables - Loop in Loop out, and what should be the 2 way and intimidiate again back to the pendant.


After declining he got someone else.. And guess waht another phone call.. Can I help him as the lights wont turn off..

AGAIN.. I Declined.....

You know what your trouble is??

You have no sense of adventure!!! :sifone:
 