D
DurhamSparky
sorry chaps seems like im going mad..!!
Scenario!
R1 = O/C
R2 = 0.98
Rn = 0.61
ok so we have open Live Ring....! Split the Ring at DB and poke a leg in to 2 MCBs for ease of faffing about..!
Power one leg up (the rest of the MCB in the CU is turned off as well)
go around with socket LED tester to find which ones not on..! ALL SOCKETS have power! (head scratch time)
so mcb off and turn other leg on..! go around again and suprise suprise i have power as well! (more head scratching!!)
get out Volt/contnuity tetser and check other MCB thats power is off..! get 240 !
turn bother MCB OFF and discnect the Legs from MCB and check continuity with unit and get continuity! replace the check with my tester and get Open circuit!!
what the ****!!! am i going mad or is my tester playing funny buggers!!
check the rest of teh MCB's L-L and no continuity so it cant be inter linked!
HELP me before i drown!!
Scenario!
R1 = O/C
R2 = 0.98
Rn = 0.61
ok so we have open Live Ring....! Split the Ring at DB and poke a leg in to 2 MCBs for ease of faffing about..!
Power one leg up (the rest of the MCB in the CU is turned off as well)
go around with socket LED tester to find which ones not on..! ALL SOCKETS have power! (head scratch time)
so mcb off and turn other leg on..! go around again and suprise suprise i have power as well! (more head scratching!!)
get out Volt/contnuity tetser and check other MCB thats power is off..! get 240 !
turn bother MCB OFF and discnect the Legs from MCB and check continuity with unit and get continuity! replace the check with my tester and get Open circuit!!
what the ****!!! am i going mad or is my tester playing funny buggers!!
check the rest of teh MCB's L-L and no continuity so it cant be inter linked!
HELP me before i drown!!