I have been asked to do a consumer unit swap out, but I have not encountered this scenario before. Take a alook at these photos', and if anybody has any answers i would appreciate some pointers. . . . thx in advance
 

Attachments

  • mr goh1.jpg
    mr goh1.jpg
    44.4 KB · Views: 498
  • mr goh2.jpg
    mr goh2.jpg
    40.2 KB · Views: 434
I dont understand what answers you want . just strip out and replace with new board. the space will be small so maybe an 8 way with all rcbo's
 
these are just like old style breakers.... replace with new board and wire as normal..of course upto 17th edition standard with rcd protection...:)
 
it looks it is in the communial/walk way in a block of flats maybe, ive never seen a CU in the meter cuboard before
 
As bugsy said, made by Wylex for councils, must thousands of these up and down the country.

Steve.
 
You wont fit a C.U. in there , use the space for a wiring centre, extend existing cables to C.U. mounted adjacent meter cab. :D
 
Can't you take the CCU inside the dwelling space I wouldn't want mine in a communal space.
 
wouldn't be so bad if you needed a tool to access them but on the ones i've seen you don't just open them up and your in. good old wylex.

on a seperate note i've seen these with what looks like an earth stud on the bottom of the enclosure where the incomer is glanded, i tested it out of interest and it was a good Ze, anyone know if this would be the earth that was intended for use? i know that the earth bar is screwed to the enclosure so i would assume so. fitted a rod anyway but just curious.
 
Yep. Working on one today. Rewire but that box is inside the property (3 bed house) All existing circuits wire via steel conduit in wall and I’ve got the option to fit a dual RCD board above the meter/CU box so no real issues. Going to drop new circuits through the ceiling and into the board via the back entry knock outs. The only issue I have is getting meter tails into the new board. Considering re-using one 25mm steel conduit drop coming into the meter cabinet to pull new tails through to ceiling void.
 
Considering re-using one 25mm steel conduit drop coming into the meter cabinet to pull new tails through to ceiling void.

just make sure both tails are inside the same metal conduit or you will get induced currents in the conduit.
 