E
Engineer54
So could you give me an example of how it will become live and stay live. And not eg with T+E on tray!
I really can't be arsed, but your assuming that only cables using an earth sheath are ever going to be installed onto any cable tray or basket that's been fitted. Personally i wouldn't install T&E cables on either system, but there are plenty here that would, and see no problem with it either. So you can't ask to leave T&E out, or say flexible cables and the like!! If a cable tray/basket system has been installed, then it's undoubtedly going to be used by others in the future. Earth it and be done with it, rather than arguing to the contrary!!

