Hello peeps, just looking for clarification on my practices here .
In the past , I have taken many cables through the same hole drilled in a joist . Mostly lighting and smoke detector cables , not heavily loaded ones , but on site , time is sometimes critical.
Have I followed " normal practice " here , or have I committed a serious bad practice?
Thanks in advance for honest replies .
 
Draw new one in very slowly if it's getting a bit close. You can build up heat and melt insulation off the fixed cable quite easily.
 
Always feed new cables un underneath the others if pulling through from below, or on top if pulling through from above, it will help reduce friction burns to the cable sheath
 