I'm going to replace a non-maintained emergency light above a communal front door of residential flats. It's the first such luminaire I've installed in a while. The manufacturer instructions specify to initially charge for 24hrs, then test for duration of 3 hours. Issue is, I suspect (haven't got access to the service cupboard yet), is that the key switch isolates the other existing EL's. I've read somewhere, not to carry out a full test, if the property is going to be occupied after the test. Can anyone advise or point me to the relevant regulations for commisioning EL's.