Scumbags it would seem someone has done it in spite to me as they would have made more of an effort to remove more of they were thiefs
Sorry, I just think that an undesigned crimped joint in a new installation is how it was designed they should be replaced as new. We are trying to appease the builder so no making good and not what is correct.Rather than just click a negative iconWhat in my post do you disagree with,maybe expand your reasoning with the post and we can debate the subject
Having seen the photo I assume that the meter box is going where the block is you may just have enough to make off in Henly blocks but you have to consider that on the LHS is normally where the cut-out is. If not they will have to be replaced and the developers will have to get to grips with that is what will have to be done you should not be having to bodge a new installation.
What you say is correct regarding the tails coming in from the bottom. Therefore the joint would be in the wall cavity as there is not enough to bring in the bottom of the meter box.I disagree with your last posted comment,recognised methods for extending cables may not be to our personal taste but are fully compliant
I disagree also with your earlier comment which I have highlighted above f
The entry of the tails into the cabinet should be upwards from the bottom
Cables entering from above can cause any damp or water ingress to run down the cable into the joint or equipment where they terminate