Has anybody any thoughts on this,
Situation is existing steel trunking 100x100 carrying low voltage circuits dropping into 3 compartment Dado, client required data also installing into Dado, trunking non-segregated and can’t be changed (loads of it) can anybody foresee any issues with installing mt3 for instance inside the steel and running data via this?
obviously a separate trunking would be preferable but the situation doesn’t allow for this. All ideas greatly received!!
 
Has anybody any thoughts on this,
Situation is existing steel trunking 100x100 carrying low voltage circuits dropping into 3 compartment Dado, client required data also installing into Dado, trunking non-segregated and can’t be changed (loads of it) can anybody foresee any issues with installing mt3 for instance inside the steel and running data via this?
obviously a separate trunking would be preferable but the situation doesn’t allow for this. All ideas greatly received!!
If the data cables are insulated to the same degree as he same degree as the V cables I don't see any problems.
'
 
Last edited by a moderator:
Unitrunk do Dividing Fillets.

1612295639914.png
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined

Thread Information

Title
Data and LV cables.
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
5
Unsolved
--

Advert

Thread statistics

Created
Bsharp,
Last reply from
Bsharp,
Replies
5
Views
1,847

Advert

Back
Top