S

Spudnik

Chaps,

Does anyone know of a dual or twin timer that would control peak and off peak immersions?

I have a twin immersion tank with a separate peak and off peak supply in the cupboard with it.

I havent looked yet but just thought i would ask you lot first.

Ta :D
 
Hi jason , is it to run in conjunction with the eco 7 , what i have done in the past is to use a honey well heating controller and switched the load with a couple of heavy duty relays works a treat then you can controll each element at differant times as youll know then i just re lable the programmer
 
Thanks chaps,

Trouble is, i have a peak (standard) immersion circuit, and also an off peak circuit from a separate meter and standalone CU.

So im thinking i will need a timer with dual inputs and outputs?

If not, i can always install two single channel timers.

Cupboard is a bit tight tho :D
 
Thanks chaps,

Trouble is, i have a peak (standard) immersion circuit, and also an off peak circuit from a separate meter and standalone CU.

So im thinking i will need a timer with dual inputs and outputs?

If not, i can always install two single channel timers.

Cupboard is a bit tight tho :D

Not sure you can't do it with the Horstmann's

I've got a broken one in the back of the van......... Give me 5 I'll go and have a nose at the connections


__EDIT___

NOPE
Not with the one I've got.... Although you could always use a contactor
 
Last edited:
Yes you can you can have 2 supples in it one will work for the 12 hour eco 7 the other works on the boost timer but it depends on the modle number
 
image_4259.jpg
i think its this one may be wrong mind:D
 