S
SirKit Breaker
I have just had my easiest day of the year. Turned up at job to 1st fix in a kitchen, stud wall and ceilings should have been taken down yesterday but they weren't. Joiner (he is a mate) turned up at 9am full of apologies. Anyway between us we pulled down the wall and ceiling and took the kitchen out, removed the tiles and re jigged the plumbing. I started 1st fix at 1pm, there was a redundant 6mm cable from CU to back of oven in the right place for me, a single socket in the removed wall, part of house ring in exactly the right place for the Island, and both ends of the old kitchen ring within 2 feet of where i needed them, and enough slack to move them to the new position. Cut 4 twin KO boxes into breeze and cabled up in new position, 8 down lighters switched in 4's and extractor hood bridge lighting, 3 gang switch, extractor supply, and ventilation fan wiring all installed. After all that we were in the Pub for 3.30pm. all tested OK and I am doing the CU on friday, only 1 circuit left to dead test, live test all, and job is a breeze.