Right iv got my assessment in 6 weeks
As you ve gotta have a job to do your assessment.
Im going to change the CCu at a friends house ie He wants it done i need an assessment job.
The probs starts
The whole house is on 1 ring(kitchen/bathroom) the works
Iv tested it and all the values are in spec.
Iv decided to split the ring. The only problem is,hes just fitted a new kitchen etc etc
Basicly hes spent the last year doing his house up.
I can split the ring at the top of the stairs(only place without new carpet down) Plus the ring bounces all over the place ie socket upstairs then down back up again, across the room to another back down and so on.
The problem iv got is this splits the house into 2 sides not up and down.
Hes on old re wireable fuses board.
Do i use this job for my assessment? or am i opening a can of worms that wil bite me in the A**?
Do i run for the hills?
any help i would be greatfull
 
LEAVE THE RING ALONE

how many circuits in total has property got!

may be worth installing a Bunch of RCBO than messing about with 17th Edition boxes!
 
Having 2 "rings" side by side is not unusual or forbidden and in my opinion is much better than having a single ring on one RCD. Just make sure that both "rings" are not on the same RCD .

FYI, a large estate near me has approx 500 houses built this way!
 
I was thinking of putting a split load board in and just having 1 ring on 1 side and 1 on the other. The board at the mo has like 3-4 circuits going to 1 mcb(sorry i just remeber its on Old Mcb's)
Theres probs 9-10 cirs at the mo,but there all just piggy backing on Mcb's(Few radials). This is why he wants a new board. The house is a 1930's ex council house. The ring at the mo just randomly Bounses around the house with no set pattern. Iv been around and tested and found the sockets at the top of the stairs are the best place to join in to split the house in half.
And more words of wisdom?
 
how many outlets on the ring??
how many radial outlets??

what i would do personally is install a 17th box and keep circuits "as they are" just remove radials that are poked in to other circuits and place on own mcb's and spread them out individually!
 
as long as you can split it safely, there is no reason not to have 1 ring for up and down, rear of house, and 1 ring up and down for front as long as it is clearly labelled. put each ring on separate RCD. watch out for borrowed neutral esp on landing light. Or, as has been said before, fit RCBOs, cost permitting.
 
how many outlets on the ring??
how many radial outlets??

what i would do personally is install a 17th box and keep circuits "as they are" just remove radials that are poked in to other circuits and place on own mcb's and spread them out individually!
Outlets 10 max and there are 4 radials(if my testing is any good :P)
That was my plan Durham.
I was just wondering if this would be ok for my assessment
 
as long as you can split it safely, there is no reason not to have 1 ring for up and down, rear of house, and 1 ring up and down for front as long as it is clearly labelled. put each ring on separate RCD. watch out for borrowed neutral esp on landing light. Or, as has been said before, fit RCBOs, cost permitting.

I d label it well,but as we all know joe public would just flick the Mcb off(ie the misses has bought new faceplates) Every 1 i meet is a trainee spark,he would nt test for dead and he would be :S
They dont tell you about safe isolation when you buy chrome brushed SWT's down B@Q :)
 
yeah it would be ok for assessment!! just keep to the regs and be safe!! thats all examiner wants to to see!!
 
Im just going to feed him so many bacon buttys that he wont be able to Leave my gaft to do the assessment!
 
I just had my initial assessment for Elecsa this week bloke called Trevor very nice chap, I passed with no probs and testing element was no where near what I expected , I passed my 2391 4 years ago so was naturally very rusty but all he was looking for was that you can design correctly and can refer back to OSG with regards to acceptable test results just make sure all labelled up correctly and a nice neat job and u will be fine
 
good luck mattmoo

you will be fine mate you can leave the ring alone or split its what you think is for the best as well as what the customer will allow you to do in regard to damage to finish and as long as it complies and is safe then you will be fine

durham has given you good advice good luck
 