M
mattmoo1974
Right iv got my assessment in 6 weeks
As you ve gotta have a job to do your assessment.
Im going to change the CCu at a friends house ie He wants it done i need an assessment job.
The probs starts
The whole house is on 1 ring(kitchen/bathroom) the works
Iv tested it and all the values are in spec.
Iv decided to split the ring. The only problem is,hes just fitted a new kitchen etc etc
Basicly hes spent the last year doing his house up.
I can split the ring at the top of the stairs(only place without new carpet down) Plus the ring bounces all over the place ie socket upstairs then down back up again, across the room to another back down and so on.
The problem iv got is this splits the house into 2 sides not up and down.
Hes on old re wireable fuses board.
Do i use this job for my assessment? or am i opening a can of worms that wil bite me in the A**?
Do i run for the hills?
any help i would be greatfull
As you ve gotta have a job to do your assessment.
Im going to change the CCu at a friends house ie He wants it done i need an assessment job.
The probs starts
The whole house is on 1 ring(kitchen/bathroom) the works
Iv tested it and all the values are in spec.
Iv decided to split the ring. The only problem is,hes just fitted a new kitchen etc etc
Basicly hes spent the last year doing his house up.
I can split the ring at the top of the stairs(only place without new carpet down) Plus the ring bounces all over the place ie socket upstairs then down back up again, across the room to another back down and so on.
The problem iv got is this splits the house into 2 sides not up and down.
Hes on old re wireable fuses board.
Do i use this job for my assessment? or am i opening a can of worms that wil bite me in the A**?
Do i run for the hills?
any help i would be greatfull
)