Thinks he’s using this job as entry to a scheme massive...Are you member of any CPS schemes Lekky?
The hall socket is about 7ft from utility, and the bedroom socket is right next to utilityAre any of the 4 radials near to the new utility room?....
make the ring from there if you can .The hall socket is about 7ft from utility, and the bedroom socket is right next to utility
I'm am joining NICAre you member of any CPS schemes Lekky?
bad move ,tin hat on and flack jacket on .'m am joining NIC
Thinks he’s using this job as entry to a scheme massive...
Sorry not sub main, thats the next ball game later down the line , I meant a board extension cuYou could alter the original circuits as long as you tested and provided certification.
Where would you be running a sub main from and to ?
Yes, that's the plan fingers crossedThinks he’s using this job as entry to a scheme massive...
What's wrong with that? Any better schemes, its the only one I have been recommended so farbad move ,tin hat on and flack jacket on .
Convert the bedroom radial into a ring? And assumably upgrade mcb from 16a to 32a ?make the ring from there if you can .
Yes, that's the plan fingers crossed
it depends how the lay out is, you could incorporate if possible the socket to the ring ,but how many socket for the utility room .Convert the bedroom radial into a ring? And assumably upgrade mcb from 16a to 32a ?
5 double sockets & 3 fused connection units down to appliance singlesit depends how the lay out is, you could incorporate if possible the socket to the ring ,but how many socket for the utility room .