C
chloebear
I have a distribution cable to run for a domestic garage conversion - run length 40M - the main house is part of a PME system. There will be a fare loading on the new converted garage as it will have electric shower & heating. Is it feasable to export the earth from the PME or would it be best to have the garage conversion as a TT?