K
krisbel
Ive got a job on wiring a new 2 story extension. it will require new ring final circuit, shower and cooker at least. possibly a lighting circuit. the tenant does not want the original mains unit changing but it isn't up to date. am i able to install a new consumer unit for the new circuits so not to disrupt the old one and run it as a sub-mains.
all advice greatly received
all advice greatly received