Hey all, I bought a big garage that I’m going to subdivide and rent out. I am going to hire an electrician to do all work. This is not a DIY question. I just wanted to ask for advice here before hiring an electrician, so I know what I’m getting into. Thanks in advance.

The space is 2500 sqft, and has a 3 phase 250 amp panel smack in the middle at the back wall. I'm building a hallway for access to it and the other utilities on this wall and then dividing the main space in half. I want each subdivision to have a 100 amp subpanel. Is this doable?
Thanks again.
 
In theory yes! if it is a incomer rated at 250A too. The local DNO would be best to advise though if it is that straightforward to split into 2(3 if incl landlords) metered supplies.
 
Hey all, I bought a big garage that I’m going to subdivide and rent out. I am going to hire an electrician to do all work. This is not a DIY question. I just wanted to ask for advice here before hiring an electrician, so I know what I’m getting into. Thanks in advance.

The space is 2500 sqft, and has a 3 phase 250 amp panel smack in the middle at the back wall. I'm building a hallway for access to it and the other utilities on this wall and then dividing the main space in half. I want each subdivision to have a 100 amp subpanel. Is this doable?
Thanks again.
How many panels are you wanting to add. It’s doable depending on the number of panels that you want to add.
 