Hey all, I bought a big garage that I’m going to subdivide and rent out. I am going to hire an electrician to do all work. This is not a DIY question. I just wanted to ask for advice here before hiring an electrician, so I know what I’m getting into. Thanks in advance.
The space is 2500 sqft, and has a 3 phase 250 amp panel smack in the middle at the back wall. I'm building a hallway for access to it and the other utilities on this wall and then dividing the main space in half. I want each subdivision to have a 100 amp subpanel. Is this doable?
Thanks again.