Hi All,

Just a general price query because i have been known to be fair bit out on pricing this is what ive got and priced

1 x New 17th edition mains board
3 x Chrome double sockets to wire + chase in front room on a new circuit (Same ring as below to new board)
2 x Chrome double sockets to wire + chase in dining room on a new circuit (Same ring as above to new board)
1 x Straight swap switch to dimmer

Full house test certificate

Plaster all chasing out, put all carpet and cupboards back

£550
I reckon £845 plus vat myself, to add that would not allow plastering work either
 
i know mate it was tongue and cheek, these guys are deluded 1 day for eic :D
Depends on how thorough the testing and inspecting is carried out, it is not unlikely a lived in house can take best part of a day to do a proper assessment, 2 hours if bodgit and scarper are on site.
 
Depends on how thorough the testing and inspecting is carried out, it is not unlikely a lived in house can take best part of a day to do a proper assessment, 2 hours if bodgit and scarper are on site.

I test every property to the same standard , and like to refresh my testing skills I.e 2391 -2395 etc
 
I test every property to the same standard , and like to refresh my testing skills I.e 2391 -2395 etc
Okay so Lets suggest a 4 bed detached house with 12 working circuits, a dog running around looking for attention, the property has 3 bedrooms full of games and junk due to children's bedrooms etc, the 4th has an en suite with down lighters and a electric shower, the kitchen has 20 down lighters and there are 50 sockets in the premises, there is also a shed and garage and a utility room with a ring and due to the appliances positions the points hard to find. spur units and under cabinet lighting, external sockets and security lights, IMO by the time you arrive, grab a coffee then chat to the customer about what you intend to do, then go around all the rooms unplugging everything that's at least an hour gone, you then go around inspecting switches and sockets plus bonding etc, another hour or more, so before you even remove the DB cover 2+ hours have passed, then you start testing with instruments on the 12 circuits, then test RCD's whilst filling in forms and start to write out your report, lets be conservative and say a mere 20 minutes a circuit, that adds another 4 hours, so were at 6 hours already, don't forget a break for a sandwich and then a chat with the customer about findings, surely to make money a full days wages has to be booked to the Job, so cut the Crap and stop acting like a complete Novice, we both know your trying to wind everyone up yet again.
 
Okay so Lets suggest a 4 bed detached house with 12 working circuits, a dog running around looking for attention, the property has 3 bedrooms full of games and junk due to children's bedrooms etc, the 4th has an en suite with down lighters and a electric shower, the kitchen has 20 down lighters and there are 50 sockets in the premises, there is also a shed and garage and a utility room with a ring and due to the appliances positions the points hard to find. spur units and under cabinet lighting, external sockets and security lights, IMO by the time you arrive, grab a coffee then chat to the customer about what you intend to do, then go around all the rooms unplugging everything that's at least an hour gone, you then go around inspecting switches and sockets plus bonding etc, another hour or more, so before you even remove the DB cover 2+ hours have passed, then you start testing with instruments on the 12 circuits, then test RCD's whilst filling in forms and start to write out your report, lets be conservative and say a mere 20 minutes a circuit, that adds another 4 hours, so were at 6 hours already, don't forget a break for a sandwich and then a chat with the customer about findings, surely to make money a full days wages has to be booked to the Job, so cut the Crap and stop acting like a complete Novice, we both know your trying to wind everyone up yet again.

First of all , 2 hours before removing cover is so un realistic , rcd tests take minutes so that's hardly an issue , I also get customer to unplug everything for me arriving as they know we're everything is ,
20 down lights in a kitchen ..... Ok you have described an extreme situation in this case I would price accordingly , I'm no novice I just don't conduct my jobs like you , you sound as if you "make" it last a full day for what ever reason (money)
my earlier statement of testing every property the same way same standard still stands
 
Never trust the customer to unplug everything, you need to check that yourself Glasgy, or you could meggar something electronic and it could cost you a lot of money to replace, also I do not make anything last, I like to give the customer a decent professional report which is accurate and not made up by guess work and cutting corners, this is what DIYers do and it needs to stop.
 
First of all , 2 hours before removing cover is so un realistic

It really ought to be emphasised much more,the "inspection" part of Test and inspection I mean

The service must never become a numbers crunching excersise
The inspection should be "a" or even "the" major part of the overall service

We really could take that 2 hours or so before taking the cover off,it enables us to get to know each installation
 
Any fool can bash their way through an inspection,missing things out on the way most likely.
if the installation is a tidy one to start the time taken to inspect it goes down.
if its a pile of cack then the time taken to inspect it goes up.
call it DCF's rule of inspection.
i was at one today....5 hours.
no point in rushing these things as pointed out before.
It pays to be thorough on these jobs i find
i was at fault where a tenant got abelt of a switch.
turns out the boxes weren't earthed and wired up on a dodgy homer.
2 previous inspections from the same outfit somehow failed to spot 9x switches not being earthed and passed it!
what if that tenant got killed?
who is the first port of call?
aye no point in being the fastest tester in c hall is there
 
Any fool can bash their way through an inspection,missing things out on the way most likely.
if the installation is a tidy one to start the time taken to inspect it goes down.
if its a pile of cack then the time taken to inspect it goes up.
call it DCF's rule of inspection.
i was at one today....5 hours.
no point in rushing these things as pointed out before.
It pays to be thorough on these jobs i find
i was at fault where a tenant got abelt of a switch.
turns out the boxes weren't earthed and wired up on a dodgy homer.
2 previous inspections from the same outfit somehow failed to spot 9x switches not being earthed and passed it!
what if that tenant got killed?
who is the first port of call?
aye no point in being the fastest tester in c hall is there

all im saying is i dont take a full day to do a EICR or a EIC :S
unless in extreme situation the time would go up then so would the price
testing a already operating premises (domestic house 6-8 circuits) global IR , zs every circuit etc etc , plus i normally take all readings and type up at home now get more done in a working day that way
 