...Looks like a pretty common attempt,where the electrical part of your project has taken a lower priority on your contractors' list...
I genuinely feel for the OP.who probably went through the process of getting quotes,and assumed all players read from the same hymn sheet.
See this,and much worse,every month. Last one was an impressive,and expensive two-property rear orangery,bi-folds and feature log burner...the works. The door to the kitchen,opened in to the addition,and a cupboard/shoe store had been built on the lock side.
A double S/O had been fitted on the side of this,30mm pattress,cables in cupboard in trunking...all neat...until you plugged something in and tried to open the door...
Owner had asked my opinion on this issue,although several rational options were apparent...someone needed punching :icon12:
I genuinely feel for the OP.who probably went through the process of getting quotes,and assumed all players read from the same hymn sheet.
See this,and much worse,every month. Last one was an impressive,and expensive two-property rear orangery,bi-folds and feature log burner...the works. The door to the kitchen,opened in to the addition,and a cupboard/shoe store had been built on the lock side.
A double S/O had been fitted on the side of this,30mm pattress,cables in cupboard in trunking...all neat...until you plugged something in and tried to open the door...
Owner had asked my opinion on this issue,although several rational options were apparent...someone needed punching :icon12: