here are the units to cover....
together with the stuff required to fill the units..

NVQ cross reference sheet 302.jpgNVQ cross reference sheet 303.jpgNVQ cross reference sheet 304.jpgNVQ cross reference sheet 305.jpgNVQ cross reference sheet 306.jpgNVQ cross reference sheet 307.jpgNVQ cross reference sheet 308.jpgNVQ cross reference sheet 301.jpg
 
That sounds great. So how many (301-308?) units are there??
I had to do 301-308 3 times which included my am2 and 2 on site assessments. But you also have to show working on all areas even if its a picture. All I can say is take a picture of everything you do never mind how big or small. Also pictures of warning signs and a fire assembly point.
 
Try to get as much evidence as possible for the jobs you document. I.e. copy's of risk assessments, method statements, site drawings, electrical designs, test results, delivery notes. That's the sort of thing my apprentice gets asked to put into his JTL portfolio.
 