G
I had to do 301-308 3 times which included my am2 and 2 on site assessments. But you also have to show working on all areas even if its a picture. All I can say is take a picture of everything you do never mind how big or small. Also pictures of warning signs and a fire assembly point.That sounds great. So how many (301-308?) units are there??