Does your dno have notice forms for such things so you can arrange for it to be upgraded?
 
Does your dno have notice forms for such things so you can arrange for it to be upgraded?
I’ve informed my customer to notify them and arrange the upgrade I’ve now finished on the job, and I’ve noted my recommendations on my certificate to cover my arse
 
In this situation I email or phone the dno and submit a form to request upgrade..
I am in a lucky position though as over here in the iom we only have 1 dno and I’m on 1st name terms with all their staff who have a great rapport with the electrical trade..
 
You'll probably want to record it as BS3036 but it actually pre-dates that standard by a few decades. I would generally not recommend opening CI cutouts. If anything is loose or broken inside, there is a much higher risk of short-circuiting the incoming service compared with all-insulated units, with resulting nasty arc flash. The supply impedances are often lower now than when they were installed (this one could be 90 years old) so their designers were not anticipating the kind of fireball that can occur today when blowing a 315A substation fuse.

That said, if anyone comes across disconnected / redundant ones, I need them for the collection.
 
In this situation I email or phone the dno and submit a form to request upgrade..
I am in a lucky position though as over here in the iom we only have 1 dno and I’m on 1st name terms with all their staff who have a great rapport with the electrical trade..
Wish it was as simple over here bud I asked if the DNO could put an isolator switch in a couple of months back they said we don’t do that, so my response was how do I perform safe isolation then, they said we’ll get back to you, still waiting!!
You'll probably want to record it as BS3036 but it actually pre-dates that standard by a few decades. I would generally not recommend opening CI cutouts. If anything is loose or broken inside, there is a much higher risk of short-circuiting the incoming service compared with all-insulated units, with resulting nasty arc flash.

That said, if anyone comes across disconnected / redundant ones, I need them for the collection.
cheers for the info
 
In this situation I email or phone the dno and submit a form to request upgrade..
I am in a lucky position though as over here in the iom we only have 1 dno and I’m on 1st name terms with all their staff who have a great rapport with the electrical trade..
Rung em last week over here for a main fuse upgrade and got told can’t talk talk to you need the homeowner, I had to write the homeowner a script as she had no idea what to say to them
 
Just mark it down as 'obsolete' else Not verified or not known. Mark the certificate as it needs sorting by customer and DNO. Get paid and walk away.
 
Rung em last week over here for a main fuse upgrade and got told can’t talk talk to you need the homeowner, I had to write the homeowner a script as she had no idea what to say to them
Exactly the problem I had a few weeks ago so I told customer what to say to get it changed ASAP
 
Total opposite over here..
Customer only signs the form to pay the bill, we do everything else, saves so much hassle..
 

Attachments

  • B9A01699-9AA4-42C1-8BC7-F862467E8879.jpeg
    B9A01699-9AA4-42C1-8BC7-F862467E8879.jpeg
    1.5 MB · Views: 50
  • E863AA8E-4229-45AD-A729-99FFB9150339.jpeg
    E863AA8E-4229-45AD-A729-99FFB9150339.jpeg
    1.3 MB · Views: 58
Test cert for dno with every job that needs their involvement
 

Attachments

  • 72675CC2-B9ED-4A13-B5DA-A589F79F3145.jpeg
    72675CC2-B9ED-4A13-B5DA-A589F79F3145.jpeg
    1.4 MB · Views: 62
  • 246F06CB-1B7D-479A-B8BD-9CB9CB3F6281.jpeg
    246F06CB-1B7D-479A-B8BD-9CB9CB3F6281.jpeg
    1.3 MB · Views: 54
This happened to me a few months ago neutral fuse. I contacted the DNO immediately and advised the Landlord to shut off the power with a danger notice. The DNO told me to switch off the installation until they arrived. They came within an hour. I never knew what then transpired as the Landlord did not want to pay me to wait for them...
 
Test cert for dno with every job that needs their involvement
Why can’t they all be the same, what’s the rules over there for pulling a fuse to do a board change??

Napit have been trying to get the DNO to agree to let registered sparks pull and temporarily resell a cut out for what seems like years now
 
Why can’t they all be the same, what’s the rules over there for pulling a fuse to do a board change??

Napit have been trying to get the DNO to agree to let registered sparks pull and temporarily resell a cut out for what seems like years now

We can’t pull the fuses, I’ve only ever done it a handful of times and that was for real emergencies to avoid disaster.

Our island is only 36 miles x 12 so doesn’t take long for them to attend site..
Trouble with sparks pulling fuses and re-tagging is that it is open to abuse
 