plus i use sliq to email automatically the quote and also attach copy of T&C to email along with a few words on the email to advise of quote etc...
 
nice one durham very professional looking

what you mean professional looking...!!!???? I AM PRO!!

lol... getting my van re graphiced to match the new logo on invoice as well as Workwear branded to my company. i expect to get busy this year as its been promising so far ..!
 
professional looking to the customers eye mate lol

yes graphics and the workwear a good idea
 
Yes for me too. Work was so bloody slow just before Christmas and through January, but now all of a sudden the phone keeps ringing.
Happy days are here again.
 
Last edited by a moderator:
bruce that rewire in manchestorrrr well i just scribbled ya name off ya cheeky money!

yeah i get emails sent to me when a cust wants a job doing!! saves me answering my phone and going ermmm let me find a pen!! profesional approach all the way! some times i loses out on small guy as they think im too big for them by my company image!
 
sorry steve if i have let you down when i was told about it i didnt want to say yes to it without being able to commit to it mate as you know my situation and i need to sort lots of other things first

I really appreciate the offer and i did think about it but decided it was better to say so than maybe letting you down at a later date did you want me to go do them for you?
 
i was going to form a crack team of 4/5 (me and work collegue + 2 others and your name was thrown in along with potentially manda to help you get ya NVQ done and earn some coin at same time!) + another spark
 
i thought you were wanting me to do the jobs alone for you mate why are they big houses just thought you wanted me to do them by myself for you, and as you know i am not currently set up and a carer for the mrs i have to sort these things

cheers i do appreciate the thought mate and yes the coin and the NVQ bit would have been very useful i have been waiting for VQ training to phone today but they havnt so i am ringing them back morn if not i will go with delta as time is running out
 
no they 2x flats located top/bottom Full rewire and i dont want to be messing about in that part of the world longer than 4 days lol!!

2 days each a flat i reckon! hence the crack team! get them both started and finished at same time! :)
 
Make it a race.......

Bonus for the flat finished first...............

Hmm maybe not a good idea
 
in Hell james!! there would be diagonal cables and the like!! lol mr polish would win !! chop the ends off by 2 inches connect brown blue cable and place new socket front on..! :)
 
As long as they are crimped and heatshrinked properly whats wrong with that?

Most cable deterioration is where it is loose or in contact with air, most of my rewires are done like that.

Its good for the environment, less copper and pvc used = reduced greenhouse gasses..everyones a winner
 
yes i know what your saying and yes in certain places the faster you are in and out of there the better when i was working new build and rewires if house was new 4 of us 2 hrs 3 bed
if rewire then a day each doing our own bits lol
yes i used to draw the short straw for the lighting in the coal dust filled loft lol
and then onto downstairs lighting or one of the rings
we used to be able to do upto 5 houses first fix new build various sizes in a day including swa to garage and with other snagging jobs also depended on the site and how fast they needed the houses 4 of us use to keep 22 sites going some days we worked 22hrs to get it done
you have the right idea many hands make light work and the banter keeps you going
 

OFFICIAL SPONSORS

Back
Top