Hi im new to the forum.
Im installing 5 flats and a landlords supply to a building in Cambridge and am being told by uk power networks that im to install a isolator before the meter. they have brought in a 95 waveform cable in to a 200 amp head and i am to provide directly after the head a TP isolator they will wire it in to there head and i have to then split it into 6 ways for the meters. This is a new policy brought in last year. although i dont like the idea of this, as when installing the cables they break the isolator who will replace it. Or that im responsible for anything before the meter dose not make me happy. My problem is how i split this into six meter points as i cant see that i would want to take 6 sets of L-N-E out of an isolator. i could use henley blocks which would be fine for the 3 phases but i would need a 7 way block for the N which dont exist i could link 2 together but just seems a bit of a mess. i also thought of putting a 3 phase board there instead of the isolator but getting 25mm tails in to the N bar? or maybe some bus-bar trunking but this will be quite expensive and use a lot of space as would require 3m to get 6 outlets. but may be the only way to go any suggestions

Sam
 
I'm very comfused as to why they are asking you to fit part of the system which is on there side unless they have 1 incoming meter to charge the landlord and you are supplying private meters...

I would get an email confirmation to what exactly they are supplying and what you need to supply.

The usual set up is the incoming cutout to main meter possibly in an ISU then out to a distribution board usually a Ryefield that fuses down all the separate ways to the meters... you need to find out all the details and why they are asking you to fit and supply equipment for there side of the supply?
 
Last edited:
Search for ukpn requirements for G87 this will give you all the layouts for multi occupancy metering setups. It's strange but this is becoming more common, you will need to install a ryefield to separately sub fuse all the separate meters or most meter operators won't connect.
 
Thank you both that is very helpful unlike my friend at ukpn who did not explain any of that very well. The ryfield is exactly what i was looking for. And iv learnt something reading the g87. looks like im going to be a BNO, another sticker for the van
 
G87 is the guidance given to DNOs, they will have their own technique document based on this.
I have a similar new supply coming in and I have been referred to Western Power Standard Technique : SD5C Relating to LV Connections to Multiple Occupancy Buildings. I would approach ukpn (or search for) their relevant document.
In my case WP are supplying the MSDB (Ryefield) and working in conjunction with the meter fitters, all I have to have ready is the building MET with appropriately sized Main Bonding Conductors plus switch fuses for them to connect to. I understand that this method has evolved because of many (WPD) refusals to connect. My case is a new supply to enable individual metering to an existing and occupied block of 6 flats.
Might be worth another call to ukpn to see if they could be similarly obliging (at a sensible price!).
 

Reply to Isolator before the meter in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

Good afternoon all, I have been asked to look at a problem with a bolted neutral but no one seems to know what exactly is the problem. SSE...
Replies
0
Views
649
Hi everyone, a landlord is converting a house into two flats and wants a separate consumer unit for both flats upstairs and downstairs. He also...
Replies
13
Views
1K
Hi all -- full disclosure I am a 'DIY-er' but wanted to post here for greater visibility seeing as I certainly won't be doing this work myself...
Replies
21
Views
4K
D
Hi, I have received conflicting advice about Main Isolator Switches and would appreciate forum member's help to plan a way ahead. Looking to the...
Replies
5
Views
2K
Deleted member 155212
D
We have a meter EDMI - ES30B fitted to our property. I understand from the fact sheet for the smart meter...
Replies
13
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Electrical Forum

Welcome to the Electrical Forum at ElectriciansForums.net. The friendliest electrical forum online. General electrical questions and answers can be found in the electrical forum.
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock