H
Hovis450
Hi all.
Although I'm not doing the work this is something that's bothering me with the ongoing works so I though I'd ask for advice.
I'm in the process of fitting a new Kitchen / Washroom / Bathroom and have come across the re-wire work done a few years ago to fit a new MCU with long meter tails ( 5 mts ) from the main fuse.
The meter tails have been run in plastic low smoke 20mm Kopex Plastic tubing ( sort of stuff we use in the comms industry for Fiber optic cable protection), and is twin cable with a separate earth cable. The meter tails are 16mm and the separate earth is 10mm all contained in 20mm Kopex.
Is this a correct install or does this need to come out and be replaced by T&E armored..?
It is routed through ceiling joists in at least 3 places.
Any advice anyone before I call in help.
Thanks........:stooge_moe:
Although I'm not doing the work this is something that's bothering me with the ongoing works so I though I'd ask for advice.
I'm in the process of fitting a new Kitchen / Washroom / Bathroom and have come across the re-wire work done a few years ago to fit a new MCU with long meter tails ( 5 mts ) from the main fuse.
The meter tails have been run in plastic low smoke 20mm Kopex Plastic tubing ( sort of stuff we use in the comms industry for Fiber optic cable protection), and is twin cable with a separate earth cable. The meter tails are 16mm and the separate earth is 10mm all contained in 20mm Kopex.
Is this a correct install or does this need to come out and be replaced by T&E armored..?
It is routed through ceiling joists in at least 3 places.
Any advice anyone before I call in help.
Thanks........:stooge_moe: