Hey guys,
I'm pricing a job at the moment, and could do with some help please..
It's a 7 bedroom 7 bathroom accommodation with 1 communal kitchen and seating area.
Each bedroom has 2 twin sockets, a tv point and a pendant with 1 way switch. Each bathroom has a light, pull cord and fan with isolator.
Kitchen has 8 twin sockets, 10 LED downlights with 2 x 2 way switching, 4 SFS's (fridge, boiler, washer/drier, cooker hood) 2 x cookers and 2 x hobs.
New dual stack DB with RCBO's for 24 circuits, plan is to have each bedroom on its own RCBO and each bedroom and bathroom lighting on their own RCBO.
Bonding
Heating Controls
4 pendants in the hallway with 3 PIR's
3 outside lights
I envisage it to take about 6 weeks.
I'm going in at £12.3k, I dont know why but this seems too expensive or what would you guys be charging approx. I have some pricing experience but this one is by far the biggest and can't seem to make this one work.
Cheers for your input.
Mark
I'm pricing a job at the moment, and could do with some help please..
It's a 7 bedroom 7 bathroom accommodation with 1 communal kitchen and seating area.
Each bedroom has 2 twin sockets, a tv point and a pendant with 1 way switch. Each bathroom has a light, pull cord and fan with isolator.
Kitchen has 8 twin sockets, 10 LED downlights with 2 x 2 way switching, 4 SFS's (fridge, boiler, washer/drier, cooker hood) 2 x cookers and 2 x hobs.
New dual stack DB with RCBO's for 24 circuits, plan is to have each bedroom on its own RCBO and each bedroom and bathroom lighting on their own RCBO.
Bonding
Heating Controls
4 pendants in the hallway with 3 PIR's
3 outside lights
I envisage it to take about 6 weeks.
I'm going in at £12.3k, I dont know why but this seems too expensive or what would you guys be charging approx. I have some pricing experience but this one is by far the biggest and can't seem to make this one work.
Cheers for your input.
Mark