I'm pleased that the forum search function works correctly and I found this thread :thumbsup
Does someone have the exact wording from GN8 regarding this issue that they don't mind posting on here pleeeease

(going to search google in a moment)
I'm interested to see this because it will help me resolve a situation that I am in the progress of quoting on (4 flats, only one with gas bonding, 4 separate meters all sharing water bonding and one main earth rod)
I quoted to bond from top flat to within 600mm of the outside gas meter but then the client asked, IF I was to do all four flats could it be done from the main earth terminal to each meter. Thinking along the same lines as Spin I couldn't see an issue with this but it seems I need to look into this further.
Also, surely if each flat is classed as it's own installation then it should also be supplied with it's own seperate means of earthing (rod in the case?)
With regards to the bonding to the gas in each flat would I presume that the bond would be taken from the main earth terminal in the CU to within 600mm of the POINT OF ENTRY to that flat and THEN a main bond from the MAIN earth terminal in the meter cupboard (basement) to within 600mm of each meter (one continuos bond as all next to each other)
Sorry OP for adding this but I believe this is relevant to your post and doesn't warrant creating another thread discussing the same issue
Kind Regards
1SC