Should have taken a step back and thought what is the best way to do this.
 
Last edited by a moderator:
The supply company feeds a meter, then it goes to the 1st board which feeds 4 sub boards, there is a meter before each sub board. The 4 sub boards are protected by 63A 3 pole CB's.
 
Last edited by a moderator:
?
The supply company feeds a meter, then it goes to the 1st board which feeds 4 sub boards, there is a meter before each sub board. The 4 sub boards are protected by 63A 3 pole CB's I said RCBO by mistake.
Usually, you would have an MCCB board with meters in the outgoing all in the landlord's cupboard.
 