staggered rings are better for corridor installs, and also where the cable has to change type, ie singles in trunking, and then SWA and back to trunking.

the thing wth normal ring final circuits, is that you will always have one point that is more loaded than the rest of them, due to the use of the building. So in my mind there isnt any preference to either unless you know where the loads are more likely to be. Most rings are underloaded anyway.
 

OFFICIAL SPONSORS

Back
Top